U.S. Air Force Postgraduate Dental School & Clinic

This design-build project entailed a complete replacement of the Lackland Air Force Base MacKown Dental Clinic. The new facility provides dental care, dental laboratory capabilities, support spaces, and graduate education programs, including prosthodontics, periodontics, endodontics, and orthodontics residencies.

 

US Air Force Postgraduate Dental School

 

The design goal was to create a next-generation dental clinic where staff and patients are the center of attention and feature a warm, non-institutional, healing environment that balances the technological and code/criteria-driven requirements of 21st-century dental care. The entire building is configured to maximize daylight use, minimize travel distances and envelop the users in comfortable, non-institutional finishes while providing all required infrastructure for modern medical equipment.

 

US Air Force Postgraduate Dental School

 

The design concept was derived from locating all dental treatment rooms (DTRs) on the most efficient operational, circulation, functional and daylighting concept. The DTRs form two, engaging C-shaped pavilion wings. This efficient geometry creates two pavilions joined by public spaces, support functions and vertical circulation. The shifted wings allow the public areas to align, minimizing patient travel and maximizing staff efficiency. The massing is so distinctive that its shape is being used as a graphic basis for branding the facility.

 

US Air Force Postgraduate Dental School

 

The LEED Gold-certified facility incorporates high-efficiency heating and cooling systems that far exceed code requirements for performance, as well as low-flow plumbing fixtures that reduce water consumption by 44.6% and reduce sewer flow. High-performance glazing uses daylight to reduce lighting load while improving indoor environmental quality. Other energy-saving features include daylight sensors, occupancy sensors and programmable timing controls. 

 

US Air Force Postgraduate Dental School

 

Key Sustainability Features

  • Daylighting and occupancy sensors were installed, reducing lighting electric consumption by 25%
  • Enhanced commissioning, ongoing measurement, and verification plan aid in keeping the project operating as designed well into occupancy
  • Emphasis on indoor air quality with increased ventilation, outdoor air delivery monitoring, and low-emitting materials
  • Emphasis on thermal comfort, including a thermal comfort survey for occupants

PROJECT NAME

Air Force Postgraduate Dental School & Clinic

SERVICES

Architecture, Medical Equipment Planning

PROJECT SIZE

55,617 sq. ft.

 
LOCATION

Lackland Air Force Base, Texas



certifications & Awards

LEED Gold 

2014 DBIA MAR | Design Honor Award

2014 US Air Force | Design Honor Award

2013 IIDA-MADA| Healthcare Gold Award

Children’s Mercy + Camber Mental Health Mental Wellness Campus

Children’s Mercy + Camber Mental Health Mental Wellness Campus

The 72-bed psychiatric hospital was developed to meet the urgent need for trauma-informed mental healthcare in the region. Recognizing the shortage...

Read More
Kansas State University | Office Park Phase III

Kansas State University | Office Park Phase III

Envisioned as a cutting-edge corporate hub in the Edge Collaboration District, the Kansas State University Office Park stands out as a premier...

Read More
FBI Kansas City Field Office

FBI Kansas City Field Office

The FBI sought a solution to modernize and streamline the Kansas City FBI division and its facilities to support a more efficient operation for the...

Read More