Modular and Prefabricated Design Part I: The New Mainstream for Health Systems
A recent HCO News article highlights how modular and prefabricated design is becoming a mainstream solution for healthcare systems facing rising...
A ribbon cutting for the Whiteman Air Force Base Communications Facility took place on December 17, 2010. The building is a 37,750 SF, two-story structure with a one-story maintenance bay at the rear and is attached to the existing single-story communications building by an enclosed breezeway. The building contains spaces for telecommunications, data processing, document staging, duplicating center, base supplies and equipment storage, audiovisual, network control center and vault, network training center and multi media center, and expanded video teleconference capabilities. The Hoefer Welker team received an OUTSTANDING PERFORMANCE REVIEW from the base!
A recent HCO News article highlights how modular and prefabricated design is becoming a mainstream solution for healthcare systems facing rising...
2025 brought a number of recognitions for our work, our people, and our growth as a firm. From project awards to individual honors and business...
Mara Sabatini, Vice President and Senior Project Manager, was recently featured in BD+C’s article, Leadership in Practice: How 40 Under 40 Alumni...