Lee’s Summit, MO, Joint Operations Facility Holds Groundbreaking Ceremony
The City of Lee's Summit held a groundbreaking ceremony on November 8, 2024, for a new $30.5 million Joint Operations Facility. This...
Consolidated Family Care / Troop Medical Clinic located at Fort Bliss, El Paso, Texas is 85% complete.
Interior finishes are in progress, which include composite tilt-up concrete panels with a textured acrylic coating, high-impact EIFS in select areas, aluminum window and door frames, glazing and a TPO roof membrane.
Hoefer Welker Architecture teamed with Walton Construction for this design-build outpatient clinic that includes primary care, pediatric, aviation medicine, physical exam, physical therapy, optometry, preventive medicine, mental health clinics, pharmacy, lab, radiology, medical records, administrative and building support functions. This 144,000 SF building is the largest free standing clinic the US Army will occupy. This project is designed to LEED Silver criteria.
The City of Lee's Summit held a groundbreaking ceremony on November 8, 2024, for a new $30.5 million Joint Operations Facility. This...
Featured in Healthcare Design with a photo tour, the new Advent Health Cancer Institute provides an all-encompassing cancer care approach aimed at...
Cedar Park has initiated the construction of a $30 million Public Safety Joint Training Facility, funded by a 2022 voter-approved bond. This...