ENR 2026 Top 500 Design Firms - Hoefer Welker
Hoefer Welker has been named to Engineering News-Record’s (ENR) 2026 Top 500 Design Firms list, an annual ranking of the largest U.S.-based design...
Phase I of the Clinic Modernization for 56th Medical Group at Luke Air Force Base in Arizona is complete. Phase II of this 77,600 SF renovation project is scheduled to be complete in February of 2010. Our scope of work includes heavy renovation of Optometry, Logistics, storage, Allergy and Immunization, Family Practice, Surgery and Orthopedics, Acute Care, Pediatric Clinic, Levels 2 and 3 Demolition of former inpatient space, Physical Therapy, Mental Health, Life Skills, Adapt, Family Advocacy, Public Health, Command, Readiness, IT, Resource Management and TOPA/TSC.


Hoefer Welker has been named to Engineering News-Record’s (ENR) 2026 Top 500 Design Firms list, an annual ranking of the largest U.S.-based design...
Hoefer Welker has expanded its national footprint with the opening of a new office in Orlando, Florida, our second location in the state. The...
Hoefer Welker has named longtime Dallas leader John Castorina as Co-CEO, joining Rob Welker in guiding the firm’s future. Castorina has helped drive...