In a recent feature by HCO News, modular and prefabricated design is highlighted as an increasingly mainstream approach for healthcare systems navigating rising costs, labor constraints, and accelerated delivery schedules. The article specifically references the JPS Health Network Medical Outpatient Building as a leading example of how early collaboration, design-assist processes, and off-site fabrication can improve quality control, reduce construction waste, and significantly shorten project timelines. Through its use of prefabricated components, the JPS project demonstrates how healthcare facilities can achieve greater efficiency and flexibility while remaining adaptable to future operational needs.